GGS provided the following services:
Project
A premiere league football stadium required gas protection for new lift pits and structures as part of upgrade works. The works needed to be completed within a strict programme and ahead of the start of the football season.
Tanking and heavy reinforcement was required leading to very complicated installation and several independent verification visits were undertaken to record compliance with the design.
A verification report was prepared and provided to the client as evidence of the installation of gas protection measures and for provision to the local planning authority to discharge the associated planning conditions.