Consultants

Gas protection verification - Football stadium upgrade works

Our client had confidence that installation of gas protection was correct and local planning authorities could discharge planning conditions.

Consultants

Our client had confidence that installation of gas protection was correct and local planning authorities could discharge planning conditions.

Client
Premier League football club
Location
North West
Date
June 2022
Project description

GGS  provided the following services:

  • Independent verification
  • Verification plan
  • Verification report

Project

A premiere league football stadium required gas protection for new lift pits and structures as part of upgrade works.    The works needed to be completed within a strict programme and ahead of the start of the football season.

Tanking and heavy reinforcement was required leading to very complicated installation and several independent verification visits were undertaken to record compliance with the design.

A verification report was prepared and provided to the client as evidence of the installation of gas protection measures and for provision to the local planning authority to discharge the associated planning conditions.

Get in touch
At GGS we provide a range of specialist ground-gas services for our clients within a variety of industries. We undertake a range of ground-gas monitoring methods, factual and interpretive reporting and consultancy.